Ministerio de Comunicaciones details roadworks progress in San Marcos for Plan Conecta

Miguel Angel Diaz Bobadilla Ministro de Comunicaciones, Infraestructura y Vivienda
Miguel Angel Diaz Bobadilla Ministro de Comunicaciones, Infraestructura y Vivienda | Ministerio de Comunicaciones, Infraestructura y Vivienda (CIV)

The Ministerio de Comunicaciones of Guatemala provided updates on road infrastructure projects in the San Marcos region through a series of posts on December 3, 2025. The tweets detailed specific routes under construction and described the ongoing work as part of a national connectivity initiative.

In its first post, the ministry listed current works: "- Malacatán – Bif. CA-02 OCC, Malacatán, San Marcos a Ruta RD-SM-10
- Bif. CA-02 OCC – Aldea Nica, Malacatán, San Marcos a Ruta RD-SM-47 https://t.co/tBQuBwAr7Q"
(December 3, 2025).

A subsequent update identified additional segments: "- Bif. RN-13, Finca La Esperanza, San José El Rodeo – Bif. RN-08, Finca San José, Malacatán, San Marcos a Ruta RN-08
- Bif. RD-SM-47, La Muralla, Malacatán – Catarina, San Marcos https://t.co/OkqfKFSaHm"
(December 3, 2025).

The ministry also outlined the technical aspects of these projects: "Los trabajos incluyen:
• Recuperación de base y estabilización con cemento
• Colocación de primera y segunda capa de asfalto
Avanzando con el #PlanConecta https://t.co/kTc0q3lDOj"
(December 3, 2025).

These initiatives are part of Guatemala's broader efforts to improve transportation networks and regional connectivity under programs such as Plan Conecta.